Technical Sheet :
90 000 m² - price NC
Metal frame studies in the EXE phase for the construction of the Vinci Construction headquarters in Nanterre comprising 4 blocks built next to the railway tracks of the future Nanterre la Folie station, including the IGH R+24 with 5 basement levels and 3 blocks in R+7.
The buildings are placed on a steel railway crossing structure. We proposed mixed steel-concrete structures, beams with a span of 18m in twin PRS mixed S355 beams and C60 concrete.
Delivery date : 2021
Project owner: VINCI - SNCF Réseau (Co-project owner)
Project manager : Jean-Paul Viguier and Marc Mimram (Architects), SIDF (BET structures)
Entreprise : Vinci Construction France (Covered enclosure and architectural lots), MaP3 (BE EXE Metal structure)