New terminal connecting south and west existing airports.
Our team is in charge of advanced structural studies, in cooperation with Vinci construction company, and of construction studies supervision.
The structure comprises 2 floor levels, using steel columns filled with concrete for fire resistance.
Client : AdP
Designers : AdP
Construction companies : Vinci Construction France with italian firms OMBA (steel structure) and Simeon (facades)
Phase : Construction
Datas : Roof area : 30 000 m2, N1 and N2 floors area : 40 000 m2, budget : 250 millions Euros