To ensure passage from the platforms of Gisors station to the city and PMR accessibility, construction of a footbridge and access to stairs and lifts.
The footbridge is a main span with a railway anti-shock pile also allowing the support of a future complementary crossing structure.
Solid foundations and lightweight semi-Vierendeel type metal structure with wooden decking (accoya type) and guardrail incorporating catenary electrical protection.
Supports on architectural concrete piers via pot bearings
Maîtrise d’ouvrage : SNCF Réseau
Maîtrise d'œuvre : MaP3 bridge and AREP architects
Entreprise : Eiffage civil engineering, ACCMA steel framework
Scope : 25 m, width 3m
Surface : 270 m² including stairs
Steel weight : 26 T and 16 T stairs
Delivered : 2020