Renovation-extension project for the Dragon Cave – Chemin des Dames Museum. The project included maintaining part of the existing building and constructing a new part on the west side.
The project provides for the construction of a new museum with the integration of part of the old building; significant modifications to the existing structure are necessary in order to meet the needs of the new organization of the space (demolitions, openings in the preserved sails and slabs, recovery of foundations by benches etc.).
The project had to stop in 2015 in the DCE phase
The current project was designed by Nasrine Seraji-Bozorgzad
Procedure : Architecture competition - winning project
Date : Stopped in DCE phase, January 2015
Surface : 1600 m2
Cost : 7,5M€ ht